I was wondering if I can get some guidance on how to temporarily pause one of the Activities in my study (ID:2037). Originally, we had an EMA Survey that was based on a participant’s school schedule. Now that it’s summer, I want to switch off the original EMA Survey and have the EMA Survey—SUMMER (ID: 22199) be live for the remainder of the summer. Is there a way I can do this without changing the triggering events in the original activity?
Thank you so much in advance!